Welcome home

Your first week,
in five short modules.

A quick walkthrough of the things every Augmen tenant should know on day one. Mark each item complete as you go — your progress saves automatically in this browser. Total time: about 15 minutes.

Progress
Module 01

Save the emergency line

Active leaks, no heat in winter, gas smells, electrical hazards. Save these numbers in your phone now — you don't want to be searching for them when something's wrong.

Save both numbers to your phone

Tap on your phone to add the main line + 24/7 emergency number to your contacts in one go. Desktop will download a .vcf file you can import.

Module 02

Set up your Buildium tenant portal

Your portal is where rent, lease, maintenance requests, and ledger live. The smoothest move-ins set this up on day one.

Module 03

Find your circuit panel

Trip a breaker (it happens) and you need to know where this is. Some night you'll thank yourself for finding it before you needed it.

Module 04

Find your water shut-off

A burst pipe in the wall can dump 50+ gallons before you notice. The shut-off stops it instantly. Knowing where it is can save thousands of dollars in damage.

Module 05

Seasonal responsibilities

Rochester winters mean a few specific things you're responsible for. Skip these and you risk burst pipes, ice dams, or worse.

You're set up.

That's everything. If something comes up that's not covered here, the FAQ probably has it — and if not, just reach out.